
Concept masterplan
A working marine gateway beside Onne, a riverside town, a leaf-shaped marina, and three quarters of the land kept as mangrove. Built in five phases, on land that is leased, never sold.
Concept illustration
Films
Life at the Fronds
29 s · narrated. Homes, walks, parks and the harbour of the leaf-shaped marina, Phase 4.
The site plan, zone by zone
33 s · music only. Each zone lights up on satellite imagery of the site.
Iwokiri in 23 seconds
23 s · narrated, with captions. Where it is and what it could become.
Concept films made from AI-generated illustrations and satellite imagery, with AI narration and music. Not the real site, not surveyed. Not an offer of investment.
The plan
Drawn on the real satellite image of Iwokiri. Hover or tap a number to see each zone.
In pictures





Phasing
Each phase starts only when the one before it is working. The quay waits for a signed tenant; the marina waits for a working town.
Phase 0 · Years 0–2
In progressPhase 1 · Years 1–4
PlannedPhase 2 · Years 3–8
PlannedPhase 3 · Years 6–12
PlannedPhase 4 · Years 10–20
PlannedDredging and reclamation
Order-of-magnitude estimates from the drawn areas, before any survey. For scale, Palm Jumeirah used about 94 million m³ of sand.
Two kinds of buildable ground
Satellite imagery shows intertidal shoals along Iwokiri's river bank and sparser, degraded marsh inland. The plan reclaims and raises on these first, and keeps the dense mangrove.
Clear of Onne's shipping lane
Iwokiri faces the eastern arm of the estuary, opposite the tip of the Onne peninsula. The Onne fairway appears to run west of that tip, so the Gateway needs its own dredged approach channel. To be confirmed against Admiralty chart BA 3286.
Satellite heights are not ground heights
Public elevation data (SRTM) reads 4–9 m over the site, but in mangrove it measures the tree canopy. Real ground levels need a LiDAR survey before any design.
Channel depth sets the market
Onne's controlling depth is reported at about 10.6–11.4 m. Offshore-support and marine-service vessels work at far less, which suits a Gateway at Iwokiri.
Sources: NESREA: EIA Act · NIWA · IFC PS6 · ThisDay: Onne depth · NPA pilotage
Every boundary here waits for survey, soil tests and the impact assessment in Phase 0.
Investment opportunities →